Construction Progress of Buildings D, E, and F at 45495 Campus Drive

August 27, 2024

The lot at 45495 Campus Drive shows ongoing development, with construction equipment and materials on-site. Foundations and structures are actively being worked on, although that could just be connected to buildings A, B and C.

Site prep for Buildings D, E and F at 45495 Campus Drive